A good emergency plan is never limited to a single option. When the first one stops working, you need a second, then a third. The PACE plan is a planning method from the military world that structures this redundancy in a clear, rigorous way that also works for citizen preparedness.
Why planning is not just one plan
Having a plan is good. Having several is better. Most people stop at plan A and hope circumstances will be kind. In a degraded situation, hope is not enough.
The logic is simple: in an emergency, conditions change fast. A phone network can be overloaded or down. A family member may not have their phone at hand. A road may be blocked. Every single plan therefore contains, by definition, a potential point of failure.
The PACE method lets you anticipate those failures and have a fallback for each one. It applies to almost every aspect of preparedness: communications, evacuation, supplies, shelter.
Core principle: an emergency plan without a fallback is an incomplete plan. Redundancy is not over-planning — it is the minimum condition for serious preparedness.
What is a PACE plan?
PACE is an acronym used in military planning. It organizes the available options into four levels of decreasing priority.
PACE stands for:
- P — Primary: the preferred method, the most effective under normal conditions.
- A — Alternate: a replacement option, as reliable as possible, used when the first is unavailable.
- C — Contingency: a backup that does not rely on the same resources as the first two.
- E — Emergency: the last-resort plan, the most robust, used when everything else has failed.
What separates good PACE planning from a simple list of options is attention to common points of failure. If three of your four plans depend on the cellular network, your PACE gives you only one real layer of redundancy. The goal is for each level to rely on a way of working different enough from the previous one to keep working even if the cause of the first failure persists.
Concrete example: a family communication PACE plan
To illustrate, take a practical case: you need to stay in touch with a relative — let’s call him Leonard — in an emergency. Leonard lives some distance away, works in a factory and spends his evenings on his computer. Here is how to build a PACE plan suited to his reality and yours.
This example is about communications, but the method also applies to evacuation planning, meeting points, water sources, backup power or any other aspect of your preparedness.
P — Primary plan: the cell phone
The primary plan is the one you use first, under reasonably normal conditions. It relies on the most practical and reliable method in most everyday situations.
In our example: you try to reach Leonard on his cell phone. If you haven’t reached him, he tries to reach you on yours. The numbers are saved in each phone and written down — in your backpack, on a note at your desk, on the inside cover of a notebook. Redundancy also applies within a single plan.
A good primary plan is two-way: anyone involved can start it, without waiting for the other to make the first move. If calls won’t go through, try a text message: it uses less network capacity.
A — Alternate plan: online messaging
The alternate plan comes into play when the primary doesn’t work. Ideally it should be just as reliable, but use a different channel.
If Leonard can’t be reached by phone, you log into a messaging app (Facebook Messenger, Signal, WhatsApp or another platform chosen in advance) from any connected device — a neighbour’s Wi-Fi, a library or an emergency shelter. Leonard does the same if he can’t reach you by phone.
This plan has a limit: it still depends on an Internet connection. If the failure comes from the network as a whole, it won’t work either. That is exactly why the plan doesn’t stop there.
Note also that online messaging is not a secure channel. Keep sensitive details vague — a wording agreed in advance is often enough to get the essentials across.
C — Contingency plan: the physical meeting point
The contingency plan relies on neither phone nor Internet. It works even if communication networks are completely down.
In our example: if there has been no contact by phone or messaging, each of you goes to the other’s workplace — starting with whoever is closer — and leaves a written message stating your intentions and destination.
The key to this plan is that it depends on no technological infrastructure. It relies on places known in advance and clear instructions. For it to work, these places must be explicitly agreed — and known to both parties, not just one.
It also helps to plan for the case where both people try to reach each other at the same time and miss each other. A simple protocol — for example, always leaving a written message before moving on — avoids fruitless back-and-forth.
E — Emergency plan: radio
The emergency plan is the last level. It comes into play when all the others have failed. It must be as robust as possible, independent of fixed infrastructure and usable even in severely degraded conditions.
In our example: you and Leonard each have a radio (a transceiver, ideally with an amateur radio licence). You have agreed in advance on a monitoring frequency and a regular listening schedule — for example, five minutes every quarter hour. When the emergency plan is triggered, each of you transmits on that frequency following this protocol until contact is made.
This plan is less convenient and less discreet than the others. But it works independently of any centralized network, which makes it the strongest safety net in the whole structure.
The complete PACE plan — summary of the example
Here is the summary of the communication plan illustrated in this article. You can use it as a template to adapt to your own situation.
| Level | Method | Details | Depends on |
|---|---|---|---|
| P — Primary | Cell phone | Numbers saved and written down in at least two places; either person can call. If calls fail, try a text. | Cellular network |
| A — Alternate | Online messaging | App agreed in advance, usable from any connected device. Careful wording. | Internet |
| C — Contingency | Physical meeting point | The other person’s workplace or an agreed fallback location, closest first. Written message left on site. | No network |
| E — Emergency | Radio | Frequency and listening schedule agreed in advance; regular transmissions until contact. | No centralized infrastructure |
Add an out-of-area contact
In a local disaster, it is often easier to reach someone far away than someone in the same affected area. Choose a relative in another region as a “relay”: everyone calls or messages them with news, and they pass the information on.
Avoiding common points of failure
The most common mistake when building a PACE plan is creating several levels that share the same vulnerability. If your P, A and C levels all depend on the cellular network, a single outage sends you straight to plan E.
In planning, this is called a SPOF — single point of failure. The goal of PACE is precisely to eliminate SPOFs by varying the channel at each level.
- The primary plan can depend on the cellular network.
- The alternate plan should depend on a different channel (Internet over Wi-Fi, satellite messaging, etc.).
- The contingency plan should depend on no network infrastructure.
- The emergency plan should work even when infrastructure has nearly collapsed.
Checking your PACE comes down to one question for each level: “If the reason the previous plan failed persists, would this plan still work?” If the answer is no, revise the plan.
Applying PACE beyond communications
Communications are a natural fit for PACE, but the method extends to every area of citizen preparedness.
Evacuation
- P: main route, the most direct road
- A: secondary route, known detours
- C: route off the main road network
- E: alternative destination, fallback accommodation
Water
- P: tap water or stored reserves
- A: bottled water or water filtered on site
- C: known natural source nearby
- E: full collection and purification (rain, chemical treatment)
In each case the logic is the same: diversify sources, avoid shared dependencies, and make sure each level can work even if the previous one is completely down.
Putting the plan into practice
A PACE plan that has never been tested remains theoretical. A few steps make it operational.
- Write the plan down. Each level should be stated clearly, with precise instructions that anyone involved can follow without consulting you.
- Share it with the people concerned. Everyone must know the plan — not just you. A plan only you know cannot be shared in a degraded situation.
- Check each level’s prerequisites. Each plan needs resources or conditions. Make sure they are in place before you need them: numbers saved, radio frequencies programmed, meeting places visited in person at least once.
- Test at least the P and A levels, and visit the C location. A simple trial — even in a non-urgent setting — reveals weaknesses before they become critical.
- Review periodically. Situations change. A workplace can change, an app can disappear, a frequency can be modified. Review the plan at least once a year.
Points to watch
On amateur radio: using an amateur radio transceiver as an emergency plan assumes you have the equipment, the right licence and enough practice to use it effectively under stress. In Canada, amateur radio certification is managed by Innovation, Science and Economic Development Canada (ISED), following an exam. It is not complicated, but it takes advance preparation.
On complexity: a PACE plan that is too detailed or complex may not be followed in a real situation. Each level should be understandable by a person under stress, without documents at hand. Simplicity is a strength, not a weakness.
On confidentiality: plans shared through online messaging or unsecured channels can be intercepted or read. For levels that involve sensitive information (destinations, resources, locations), wording agreed in advance is better than explicit details.
In summary
The PACE plan is not reserved for the military or advanced preppers. It is a common-sense structure that applies to any aspect of citizen preparedness. Just ask four questions: what is my primary plan? What do I do if it fails? What do I do if the network is completely down? What do I do as a last resort? By answering these four questions with options that are different enough from one another, you have a robust planning structure — for your family, your communications, your evacuation and much more.
Further reading
To build each level of your plan, see our six-step family emergency communication plan, our 7 ways to stay in touch, our article on emergency radio and our guide to Baofeng UV-5R radios.
Frequently asked questions
Is the PACE plan only useful for communications?
No. The method applies to every aspect of preparedness: evacuation, water supply, food, fallback shelter, security. The logic is always the same: define four plan levels that don’t share the same points of failure.
Do I need an amateur radio licence to use radio in a PACE plan?
In Canada, using amateur radio bands requires certification from Innovation, Science and Economic Development Canada (ISED). Licence-free radios exist in Canada (FRS, and GMRS under the rules in force), but their real-world range is limited, often to a few kilometres at best. Check the current regulations before choosing the radio equipment for your emergency plan.
How many people need to know the PACE plan?
Everyone involved in the plan must know it. A PACE plan is only valuable if every link in the chain can activate it independently. If only one person knows the plan, the whole plan depends on their availability — which recreates exactly the kind of point of failure PACE is meant to avoid.
How often should a PACE plan be reviewed?
An annual review is a reasonable minimum. It is also worth reviewing after any significant change: a move, a new job, new habits or equipment. A PACE plan that reflects an outdated reality is no more useful than an old map.